单选题
编号:2692119
1. If flotation costs are treated correctly in calculating the net present value of a project that will begin in the current period, the flotation costs are most likely:
- A.Included in the initial outlay.
- B.Reflected in the discount rate used for the project.
- C.Included in the cost of the capital raised.